How To Arrange A House Renovation

Table of contents:

How To Arrange A House Renovation
How To Arrange A House Renovation

Video: How To Arrange A House Renovation

Video: How To Arrange A House Renovation
Video: How to Plan a Home Remodel Step by Step -Tips for Designing a Home Renovation to Increase Home Value 2024, December
Anonim

Reconstruction of the house is required in case of redevelopment, an increase in the capacity and total area of the house, changes in the quantity and quality of premises. For its registration, you need to obtain permission for reconstruction, and for this to collect a certain set of documents.

How to arrange a house renovation
How to arrange a house renovation

Instructions

Step 1

Decide that what you are going to produce in your home falls under the definition of remodeling. Reconstruction involves changes to the house that violate its safety, or affect the rights of third parties, or exceed the maximum parameters of the permitted construction.

Step 2

Before carrying out renovation work, contact the local authority responsible for issuing building and renovation permits in your area. In it you can get a sample application for reconstruction and a recommended list of documents, as well as consultations.

Step 3

Gather an approximate set of documents that you will need to complete the reconstruction of a house in any case. These are the following documents: 1. statement;

2. a copy of the certificate of ownership of the land plot on which the house is located;

3. cadastral plan of the land plot;

4. project documentation for the house;

5. plan of the house and the site of the BTI;

6. BTI certificate of ownership of the house;

7. technical conditions;

8. identity document (passport);

9. if the house belongs to several persons, then you also need a notarized consent of it. co-owners. In some cases, other documents may be required.

Step 4

After receiving permission for reconstruction and completing a complex of reconstruction works, you will receive permission to put the house into operation. To do this, you need to apply with the same authority to which you applied for a permit for reconstruction. You will need to attach a document certifying that the house has been reconstructed in accordance with the technical specifications, project documentation, as well as a permit for the reconstruction of the house, title documents for the house and the land plot. After receiving permission for commissioning, the reconstruction can be considered completed.

Recommended: