According to the Urban Planning Code of the Russian Federation, any construction on the territory of the Russian Federation can be started with the necessary documents and permits. Unauthorized construction of any property is strictly prohibited and punishable by law. To obtain a permit, you will need to collect a package of documents and present them to the district department of architecture and urban planning of your region.
To obtain a building permit, you will need to obtain an extract from the cadastral passport and a copy of the cadastral plan for the land plot. These documents are issued by the Federal Office for Unified Land Registration, Cadastre and Cartography only if the site is registered, delimited and formalized in accordance with the requirements of the law.
If the plot is not registered in the cadastral register, you need to contact the land committee, call a cadastral engineer for surveying and, on the basis of the received technical documents, put the land plot on cadastral registration, after which you can get all the necessary documents.
If there are buildings on the land plot, then an extract from the cadastral passport and a copy of the cadastral plan will be required for all buildings. These documents are issued at the BTI on the basis of an inspection of the buildings by a technical engineer.
Next, you need to invite a licensed architect, draw up a project and sketch of the future structure and engineering communications.
With the received documents, you should contact the Department of Architecture and Urban Planning. Fill out an application, present all the documents received, your civil passport, a certificate of ownership of the land plot and buildings, if any. If the site is leased, then a lease agreement will be required.
The architecture department will issue a document of approval, which must be signed in the department of communal systems, in the fire protection of the area, in the local administration.
The signed document should be contacted again by the architecture department. Based on all the submitted documents, a document will be drawn up allowing the construction to be carried out. It is issued by the chief architect of the city or district. They will also issue a construction passport for the construction of the building.
The obtained permits must be reserved with the local administration.