The construction work schedule is a step-by-step plan for the implementation of a given amount of work at a certain time. Thanks to competent planning, it is possible to complete the work on time and without exceeding the budget.

How to draw up a construction schedule
How to draw up a construction schedule

Necessary

Excel program or paper and pen

Instructions

Step 1

Based on the scope of work, determine the time frame for each stage. It is necessary to take into account the regulations approved by the state. They are specified in standard documents - building codes and regulations.

Step 2

From the requirements put forward by the customer for the object, determine what technologies and methods you are going to use during construction. Calculate the total time to complete the work. It is possible that the construction technology you have chosen will allow you to combine several stages of work in one calendar period. Create a timetable in Excel spreadsheets.

Step 3

Calculate the required material and non-material resources for each type of work. Namely: the composition of teams and teams, the number of hours required for each type of work, materials and equipment. Based on technological requirements and labor legislation, it is necessary to correlate production processes with the schedule for the supply of materials. The goal of such planning is to speed up production as much as possible while minimizing costs and downtime.

Step 4

Based on the established deadlines for each stage of work, enter the target dates. It is advisable to draw up daily schedules for all production processes. This will make it easier to track current problems and take effective measures to solve them. If the project is complex, then you can create several graphs, based on the possible number of options for the development of events. Consider all risks and prepare an action plan for each critical situation. In this case, the prompt replacement of one schedule with another will keep the planned timeframe for the work.