Redevelopment of an apartment cannot be done independently. For illegal changes, they will impose a huge fine and force everything to return to its original form. If you plan to globally change something and do something differently than indicated in the plan and technical characteristics of housing in the BTI - get the appropriate permission from the authorized bodies. It is necessary to visit a large number of authorities and collect a package of documents and only after that proceed with the redevelopment of the apartment.
Necessary
- -redevelopment project
- -signature of the main department of architecture
- -signature of SES
- -resolution of fire authorities
- -gas and energy company
- -balance holder at home
- - housing commission
- -authorized department in the city hall
- - civil liability insurance
Instructions
Step 1
Redevelopment is any action with partitions and doorways, combining a bathroom or a corridor, rooms, kitchens, combining apartments by building openings or demolishing walls, replacing a stove, power supply, heating, changes in the ventilation duct system, moving a bath or toilet.
Step 2
If you are ready to draw up the documents for permission to redevelop, you need to start by contacting a licensed company of architects and order the drafting of the desired redevelopment. It will be developed taking into account your desires and all the rules and regulations applied during construction according to the type and design of your apartment and the house in which it is located.
Step 3
Agree the developed project with the main department of architecture of your area. If it is approved, it must be signed by all authorities that are responsible for utilities at home, fire safety and for the supply of all energy resources connected to your home.
Step 4
Contact the central epidemic station in your city. They must put their approval on the project, taking into account the compliance of your project with all sanitary standards.
Step 5
The main fire representative of your area should write a conclusion that the new project will not interfere with the fire safety of the entire house.
Step 6
Redevelopment must be approved by the owner of the house on the balance sheet, which it contains.
Step 7
Collect signatures from the gas and energy company supplying energy to your home. They should write that your project will be safe in terms of supplying gas and electricity to the entire house.
Step 8
Invite the Housing Commission from the District Inspectorate. They will draw up an act permitting the redevelopment.
Step 9
Do not forget that each service is paid and its registration takes from 1 week to 2 months. In general, it takes up to one year to collect documents permitting redevelopment.
Step 10
After collecting all the signatures, you need to issue a civil liability insurance policy for all actions that you are going to perform.
Step 11
The final resolution must be delivered by the authorized bodies to the city hall.
Step 12
The list of all actions and signatures is not complete. Additional signatures and documents may be required depending on the situation.